Roadmaps and Gantt
0 of 5 shipped. Nothing has shipped here yet. The list below is what this family will hold, and how each structure differs.
Planned 5
- Pro
Roadmap with Quarter Lanes
Coarse quarter and month scale with team lanes; bars are buttons opening a popover with dates and summary, and a List view toggle renders the same data as a table for screen reader and small-screen users.
- Pro
Gantt Chart with Text Dependencies
Dependencies are written out in a table column and in each bar's accessible description instead of relying on connector lines; dates are changed through date pickers in the row, so no bar dragging is needed.
- Pro
Roadmap Milestone Track
Interactive planning surface, unlike the read-only status track in data display: point-in-time markers on one line rather than duration bars, selection works like tabs so arrow keys move between milestones and open their scope panel, and the track turns into a vertical stepper on narrow screens.
Now, Next, Later Roadmap
Date-free horizon buckets with outcome-led cards and a confidence indicator; movement between horizons uses a per-card menu, so no drag library is required.
- Pro
Release Timeline
Vertical, release-centric structure: each node is a version that expands to its scope list, the nearest upcoming release is expanded by default, and shipped releases collapse to one line.