Skip to content
Hazine

Kanban boards

0 of 7 shipped. Nothing has shipped here yet. The list below is what this family will hold, and how each structure differs.

Planned 7

  • Kanban Board with Column Counts

    Baseline board: sortable columns of cards with keyboard drag (Space to lift, arrows to move, Space to drop, Escape to cancel), screen reader announcements for every move, a count in each column header, and a repeat-entry inline composer at the foot of each column.

  • Kanban Board with Swimlanes

    Two-dimensional matrix: cards live in a lane and column intersection, lanes collapse independently, and a Group by select switches the lane dimension without changing columns.

    Pro
  • Kanban Board with WIP Limits

    Capacity is a rule the board enforces: header meters show count versus limit, over-limit state is communicated with icon and text as well as the warning token, and a limit editor lives in the column menu.

    Pro
  • Weekday Planner Board

    Columns are dates instead of statuses, so moving a card schedules it rather than changing its state; day headers sum estimates into a load figure, today is marked with aria-current, and a Move to day menu on each card is the non-drag path.

    Pro
  • Kanban Board with Subtask Progress

    Cards are small interactive containers: subtasks expand in place and are checked off inline, the progress bar updates live, and completing the last subtask offers to move the card to the next column.

    Pro
  • Kanban Board with Backlog Tray

    Two-pane structure that separates the pool of candidate work from the board: the tray is a filterable list rather than a column, pulling an item is a button action with drag as an addition, and a capacity summary updates as items enter or leave the sprint.

    Pro
  • Kanban Board with Move-To Menu

    Menu-driven movement is the primary interaction, with zero drag dependencies: a submenu per column, an Undo toast after each move, and a single-column tabbed layout on small screens.

    Pro