Timelines
0 of 5 shipped. Nothing has shipped here yet. The list below is what this family will hold, and how each structure differs.
Planned 5
Vertical event timeline
The baseline timeline: an ordered list with a rail drawn by pseudo-elements that stops at the last node, and node icons that vary by event type alongside the text.
Timeline grouped by day
Two-level structure: a heading and a separate list per day, a grouping helper that takes a timezone and locale, and sticky day headers inside the scroll container.
Timeline with actor avatars
Actor-centric nodes and typed payloads: avatars replace icons on the rail, and events render one of several bodies (plain, comment card, field change) from a discriminated union.
Milestone track
Horizontal, state-based progression rather than a log: each milestone states its status in text, the current one is marked with aria-current, and it is read-only with no selection, panels or navigation (the selectable planning version lives in roadmaps and Gantt).
Timeline with collapsible older events
Length management on the rail itself: a disclosure node replaces the hidden run, the count is part of the button name, and revealed items mount in place without shifting the newer ones.